The AI that develops ideas.
One place to develop ideas — from first thought to finished work.
Capture, consolidate, and develop your ideas with AI — then turn them into articles, podcasts, videos, websites, and more, in a click.
Not a chat that forgets — a thinking machine that helps you consolidate many sources into coherent, developed thinking — refined over many passes, then published in whatever format you need.
It might take a hundred sources — articles, PDFs, videos, notes, textbooks — read, weighed, and merged into one outline before the essence comes into focus. Developing an idea is iterative: many passes, not one flash. IdeaM is built for that work.

Watch IdeaM turn one idea into finished work
Everything feeds the same process — even an interruption like a new email flows right in, gets developed over many passes, and comes out as finished work.
Read widely, merge into one outline, refine the essence — then publish it in any format. That's idea development, not a one-shot answer.
Real screens from IdeaM — every one produced from a plain-English prompt, an imported file, or a pasted link.

Turn a research outline into a colorful mind map with one plain-English request.

Many sources in, one idea developed, many finished formats out — drawn from a prompt.

A real, editable, color-coded spreadsheet living right inside your outline.

A table of results becomes an at-a-glance chart from a single prompt.

Import a document and turn it into finished, structured, visual work.

Pull a YouTube source into your notes and watch it in place while you work.
A query box answers. A filing cabinet stores. IdeaM develops — the difference between a moment and a process.
You ask, it answers — then the thinking evaporates. No structure, no growing memory, no body of work. A moment, not a process.
A place to store what you already figured out. It holds your notes, but won't help you develop them, connect them, or turn them into anything.
The only one that works with you to develop an idea over time: capture, structure, enrich from the web and AI, consolidate it into real understanding — then produce finished work.
Reorganizing your thinking is understanding it. That consolidation — everything you know, connected and reusable — is what a query box and a filing cabinet can never give you.
IdeaM does your core work on-device — fast, private, no server round-trip. Here's what we detected on your machine, right now.
Stress-tested past one million nodes in a single outline — big enough for your biggest idea, project, or book. Not a toy. No artificial limits — scale until your hardware says stop.
Run the live benchmark on your computerFrom raw sources to finished, published work — the whole toolkit, from first spark to shipped. See it all on one page.
One outline becomes a branded slide deck that opens in PowerPoint and Keynote — with your data auto-charted.
The newest ways to move from idea to finished work — each marked with exactly where it stands today. No hype, no surprises.
Turn any part of your outline into ready-to-post content for X, LinkedIn, Instagram, and more — written in your own voice. You review every word and post it yourself; IdeaM never posts for you.
Drop in an email and IdeaM organizes it into a clean outline of key points, decisions, and action items. Turn any idea back into a polished email draft in your voice, ready to open in Gmail or Mail and send. Off by default — you switch it on.
Tag anything across your outlines, then filter to just what matters with a single click. Status tags — to-do, in progress, done — are landing next.
Ask AI to reorganize, trim, or rewrite — and watch every proposed change appear in your outline before it happens: deletions struck through, additions pending, rewrites shown before-and-after. Approve, adjust, or discard. Nothing changes without your say-so, and everything stays undoable.
Pick a branch and get a natural two-host conversation about your ideas — playing the moment it’s done. Free voices built into your Mac sound surprisingly close to human; plug in your own key when you want studio-quality narration, pay-as-you-go.
Type or dictate what you want to see — "show me unfinished design work" — and your outline folds down to just the matches, with everything else compressed but never hidden. The filter appears as visible rows you can edit by hand (it works fully without AI), and any view can be saved as a named, living view that stays current as your outline grows.
Right-click a section and it opens as a board: its sub-sections become columns, their items become draggable cards. Drag a card to another column and your outline genuinely restructures underneath — and Undo brings it right back. Free, local, no AI.
Your videos can now render real AI-generated footage for every scene, plus a themed instrumental that automatically ducks beneath the narration. Both run on your own Google key, pay-as-you-go — typically about $1–2 per scene and a few cents for the music, estimates only — and IdeaM shows you the estimate and asks before anything runs. Unchanged scenes are cached and never billed again, and if a scene ever fails it falls back to a designed slide, so your video always finishes.
“You’ve made this before — 2 of 4 sections changed.” Regenerate a podcast or video you’ve made before, and IdeaM rebuilds only the sections you actually edited, reusing the rest — faster, and cheaper on paid voices and scenes. Start Fresh is always one click away.
Point IdeaM at a folder and it sorts your files by meaning, not filename — turning a messy drive into an organized outline you can actually navigate. On the roadmap, arriving after launch.
Your outline is your life's work. So in IdeaM, AI proposes — you decide. Every time.
When AI wants to edit your outline, nothing just happens to you. Deletions appear struck through — before anything is deleted. Additions arrive as pending items. Rewrites show up side by side, before and after. Big operations come with per-item checkboxes, so you approve exactly what you want and discard the rest. And everything stays undoable. It’s the review you’d give a trusted editor — built right into the outline.
Connect an AI assistant like Claude Desktop, and it can read and search your outlines to help you think. But it can only suggest changes — every edit comes back to you for approval inside IdeaM. Until you say yes, your files stay exactly as you left them.
Outlines live as plain files on your own computer, with 23 export formats and no lock-in. Back them up, sync them, walk away with them — they’re yours.
Read our data ownership statementBefore any AI operation that could cost real money, IdeaM tells you who pays and what it typically costs — and waits for your yes. A private usage ledger on your own device records your AI activity for your eyes only; nothing leaves your machine, and nothing runs up a bill behind your back.
The market is discovering that AI you can inspect beats AI you have to trust blindly. We built IdeaM that way from the start.
A fast trailer of three real workflows — from first spark to published work. Hit play.
Real screens from IdeaM. Point it at an idea — and watch it become finished, beautiful work.
Drop in your ideas and watch them become a structured outline — complete with an AI-generated mind-map you can actually follow.

Text, videos, a flowchart, and a table — all living together in a single page. No tab-hopping, no scattered files.

Describe the numbers you need. IdeaM builds a real, editable spreadsheet — with the data already in the cells.

Color-coded status boards keep every workstream, owner, and deadline in view — so nothing slips and progress is obvious at a glance.

One click to generate from context, expand a single thought, or build out every branch at once — the thinking grows with you.

Turn any branch of your outline into a diagram — instantly, from what you've already written. No drawing, no dragging boxes.

Embed Google Docs, Sheets, Slides, YouTube, maps and more. Your whole workspace lives inside one living outline.


Capture, develop, and produce finished work in the language you think in — IdeaM speaks 21 languages, so your ideas aren't limited by where you're from.

Everyone else stores the thinking you already did, or vends a one-shot output. We do the thinking with you — and hand back finished work, iteratively, in your voice.
A beautiful filing cabinet — you write every note and link by hand.
An AI partner that generates, expands, merges, and produces the finished thing.
A blank container you must architect and babysit; AI is a bolt-on.
Start from one idea; the structure and the output grow for you.
Brilliant, steep, cult-ish — great for people who live in it.
Outline-native too, but built for doers who want a book, site, or plan out the door.
Ask, get a one-shot output — you can’t deeply steer or grow it.
Iterative and author-controlled, in your voice — a living document.
A brilliant conversation that scrolls away; no structure, no home for your work.
The same intelligence, anchored to a structure that persists, grows, and becomes deliverables you own.
Clean bullets and nothing more; no partner, no production.
True outlining plus an AI partner plus multilingual, multimedia output.
Watch a single idea grow into finished work — real journeys, from first capture to final export.

Dinesh finished his degree with no idea what came next — and a quiet fear that AI would leave no career for him. One outline became a living plan he could reshape as the ground shifted.
Watch
Sam is eleven, taking on cold fusion for the science fair with a scholarship on the line. One question grew into a finished report, poster, talk, website, and video.
WatchGo deeper into what IdeaM does, who it's for, and how it's priced.
Multi-source synthesis, one outline to many outputs, privacy-first — the full capability tour.
See all featuresFrom trial prep to literature reviews to investigative reporting — pick the work you do.
See use casesBring your own key free forever, own it once, or Pro cloud superpowers.
See pricingHow it compares, importing notes, privacy, offline use, exports, and more.
Read the FAQThree quick steps from thinking bigger. Get the app, turn on free on-device AI, and start building — no credit card, no setup.
Get it on Mac, iPhone & iPad, or run it right in your web browser. Your work syncs with you.
Turn on free on-device AI — no API key, no cost, and your notes never leave your device. Want premium cloud AI? Bring your own key anytime.
Capture ideas, organize them, consolidate the best thinking, and publish — outlines, videos, podcasts, and more.
Native apps on Apple. Everywhere else, the free web version runs instantly — nothing to install.
The full native experience, downloaded and installed on your Apple devices.
Nothing to install. Open it in any modern browser and start right now — the free web version runs instantly, everywhere.
A two-minute walkthrough — from a blank page to a published idea.
Getting Started walkthrough
Start free forever. Upgrade whenever you want more power.
No credit card required
First month free · on web & Mac. iPhone & iPad via the App Store.
Half price · verify with your .edu email. iPhone & iPad via the App Store.
Join researchers, authors, and professionals who've upgraded their workflow with IdeaM.
No credit card required. Free tier forever.
*Node Capacity Testing: 1,000,000+ nodes tested on Apple M4 MacBook Air (16GB RAM, 512GB SSD) running macOS. Generation time: 4.2s, save time: 1.8s, load time: 1.3s, file size: 98MB. Performance varies by hardware configuration.
Platform Considerations:
Storage: Outline files (.idm) are JSON-based. A 100,000-node outline is approximately 20MB. Local storage has no practical limit; web browser IndexedDB supports gigabytes of storage.